Contract Value:
£500k-£1m
Timescale:
20 weeks
Location:
Stewarton
Sector:
Public Sector & Education

The works entailed forming a new extension to the lower end of the school (South East Elevation) to encompass a new Early Learning Centre which will be accessed via the current building by a link corridor.

The extension is a single storey timber kit erected on a brick, block and concrete solumn and a mixture of curtain walling, metal panel walls, brick plinths and Sarnafil Roof.

There was a full fit out of the extension covering dry lining, floating floors, new windows, new doors, suspended ceilings, soft floor coverings and full M&E works.

The external phase of the works encompassed hard and soft landscaping to form children’s play area with resin bound play top, artificial grass and planters.